Project Description

Location: Magrath, Alberta, Canada

Consultant: MPE Engineering

Owner: Alberta Transportation

Project Overview:

The Taylor Wasteway Spillway was Completed in May of 2017. Instream water control projects won the supply contract of 3 radial gates, embedment’s, cable hoists and stop logs.

These radial gates measure 11 feet wide by18 feet tall and are driven by Electrically Actuated cable hoists. Instream WCP partnered with Greenfield Construction as a sub contractor to fully install all of the gate related equipment on this project.